top of page

LED video cube

2020 Viavisual in cooperation with Provideo / Berlin   the video cube in Deutsche Bank Park in Frankfurt / M. renewed. A multitude of challenges had to be overcome in this project: Due to the given static load-bearing capacity of the existing construction, extra light LED modules were chosen, the effects of the increased wind load on the extremely complex roof construction as well as fire protection requirements had to be taken into account. The dismantling of the old system and the renovation took place in the summer of 2020 within just 3 weeks. In addition to the new LED system, the media control of the video cube was also brought up to date.

bottom of page